Skip to main content
Silver Line on Track

Concrete Delivery Schedule for Aug. 21 - Aug. 25

Aug. 18,  2017
 
CONTACT:     Marcia McAllister
      T: 703-572-0506
               C: 571-730-9117
               Marcia.McAllister@dullesmetro.com
 
Concrete Delivery Schedule for Aug. 21 - Aug. 25
 
The following construction deliveries are scheduled for Aug. 21 - Aug. 25 (Monday - Friday) in support of the MWAA Rail Yard and Maintenance Facility project. The construction deliveries will be made to the Dulles Corridor Metrorail Project Rail Yard and Maintenance Facility along US Route 606 (Old Ox Road) and Mercure Circle as detailed below:
 
 
WHAT: Stone delivery (15 trucks) of ballast material at the layup yard.
 
WHEN: Monday - Friday between the hours of 7 a.m. to 5 p.m. 
 
HOW: Trucks will travel from Chantilly, coming from Rte 50, North on Rte 606/Old Ox Rd to the project site.  
-----------------------------------------------------------------------------------------
 
WHAT: Restraining Rail delivery (1 truck) to be installed in the yard lead track. 
 
WHEN: Thursday between the hours of 7 a.m. to 1 p.m. 
 
HOW: Trucks will travel from Allentown, PA, South on 15, East on 267, South on Rte 606/Old Ox Rd, and will have to turn around at Mercure Circle to make the right into the jobsite.
-----------------------------------------------------------------------------------------
 
WHAT: Precast Panel delivery (8 trucks) in 45 minute increments for installation at building TBD.
 
WHEN: Monday - Friday between the hours of 7 a.m. to 3 p.m.  
 
HOW: Trucks will  travel from Winchester, VA, East on Rte 7, South on 28, and West along Rte 606/Old Ox Rd to the project site, making the U-turn at Mercure Circle to make the right into the jobsite.
-----------------------------------------------------------------------------------------
 
WHAT: Turnout delivery (6 trucks) for installation in the yard lead track.
 
WHEN: Tuesday, Wednesday and Friday between the hours of 7 a.m. to 12 p.m.  
 
HOW: Trucks will  travel from Reading, PA, West on 267, South on Rte 606/Old Ox Rd, and will have to turn around at Mercure Circle to make the right into the jobsite.
-----------------------------------------------------------------------------------------
 
WHAT: Concrete delivery (15 trucks) for Arthur Site Concrete installation for paving.
 
WHEN: Monday and Tuesday between the hours of 7 a.m. to 12 p.m.  
 
HOW: Trucks will  travel from the Titan batch plan along Rte 606/Old Ox Rd to the project site.
-----------------------------------------------------------------------------------------
 
WHAT: Concrete delivery (20 trucks) for installation in the Maintenance of Way building Slab on Grade including a 31z pump truck.
 
WHEN: Tuesday between the hours of 2 a.m. to 7 a.m.  
 
HOW: Trucks will  travel from the Titan batch plan along Rte 606/Old Ox Rd to the project site.
-----------------------------------------------------------------------------------------
 
WHAT: Concrete delivery (20 trucks) for installation in the Warehouse building Dock Slab including a 47m pump truck.
 
WHEN: Thursday between the hours of 4 a.m. to 9 a.m.  
 
HOW: Trucks will  travel from the Titan batch plan along Rte 606/Old Ox Rd to the project site.
-----------------------------------------------------------------------------------------
 
WHAT: Concrete delivery (6 trucks) for installation in the TPSS.
 
WHEN: Friday between the hours of 6 a.m. to 9 a.m.  
 
HOW: Trucks will  travel from the Titan batch plan along Rte 606/Old Ox Rd to the project site.
-----------------------------------------------------------------------------------------
 
WHAT: Structural Steel delivery (3 trucks) for installation in the Vehicle Storage Facility. 
 
WHEN: Wednesday - Friday between the hours of 6 a.m. to 12 p.m.  
 
HOW: Trucks will  travel from Tennessee, traveling North on Rte 606/Old Ox Rd from US 50. 
-----------------------------------------------------------------------------------------
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2, Package B construction-related issues: 952-939-6690. For general project information: www.dullesmetro.com or 703-572-0506.