Skip to main content
Silver Line on Track

Daily Traffic Reminder for Dec. 1

Dec. 1,  2017
 
CONTACT: Marcia McAllister
                   T: 703-572-0506
                   C: 571-730-9117
                   marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane, Ramp and Road Closures Overnight on the Dulles Toll Road and Dulles International Airport Access Highway - Friday, Dec. 1 - Sunday, Dec. 3
 
Nighttime construction activities will take place overnight on the weekend of Friday, Dec. 1 - Sunday, Dec. 3, causing lane, ramp and road closures and 20-minute stoppages on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH).
 
See below for more detailed information.  All work is weather permitting.
 
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
 
Dulles Toll Road (DTR) West
 
When:   Saturday, Dec. 2, 2 a.m. to 6 a.m.
What:    Three left lanes closed, 20-minute stoppages
Where:  From mile marker 6.4 to 4.8 (from 2/10 mile before the Wiehle Avenue overpass to 4/10 mile past the Reston Parkway overpass)
Why:     Pedestrian bridge construction
 
{"gmap":{"map":{"options":{"center":"(38.954393009866244, -77.36275222398376)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.946368026213456, -77.33505964279175)"},"marker1":{"position":"(38.95337679769145, -77.36351251602173)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Friday, Dec. 1, 7 p.m. to Sunday, Dec. 3, 6 a.m.
What:    Right shoulder closed
Where:  From mile marker 3.6 to 3.4 (from 2/10 mile before the Monroe Street/Van Buren Street overpass, continuing to the overpass)
Why:     Station construction
 
{"gmap":{"map":{"options":{"center":"(38.95318322924391, -77.38808300592041)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.95273435582513, -77.38609671592712)"},"marker1":{"position":"(38.95306809258642, -77.38848924636841)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, Dec. 1, 10 p.m. to 6 a.m.
            Saturday, Dec. 2, 10 p.m. to 6 a.m.
What:    Full closure of DIAAH westbound; traffic detoured to DTR westbound. No toll will
         be charged to airport traffic.
Where:  From mile marker 9.1 to 3.3 (from 2/10 past the Beulah Road overpass to 1/10 mile past the Monroe Street/Van Buren Street overpass). Follow detour. Airport traffic will use ramp at mile marker 3.3 (1/10 mile past the Monroe Street/Van Buren Street overpass) to access the westbound DIAAH.
Why:     Station and pedestrian bridge construction 
 
{"gmap":{"map":{"options":{"center":"(38.95390910009407, -77.38949921228027)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.94247118327961, -77.28510618209839)"},"marker1":{"position":"(38.953276677264185, -77.3898196220398)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 <><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.