Skip to main content
Silver Line on Track

Daily Traffic Reminder for Jan. 8

Jan. 8,  2017
 
 
CONTACT: Marcia McAllister
                   T: 703-572-0506
                   C: 571-730-9117
                   marcia.mcallister@dullesmetro.com
 
Dulles Corridor Metrorail Project - Phase 2
Lane Closures Overnight on the Dulles Toll Road and Dulles International Airport Access Highway -
Monday, Jan. 8
<><><> 
 
Nighttime construction activities will take place overnight on Monday, Jan. 8, causing lane closures on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH), including a full closure of eastbound DIAAH to allow construction on the Innovation Station pedestrian bridge.  Traffic will be detoured to the eastbound DTR and no toll will be charged to airport traffic. 
 
See below for more detailed information.  All work is weather permitting.
 
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
 
Dulles Toll Road East
 
When:   Monday, Jan. 8, 10 p.m. to 5 a.m.
What:    Full closure of eastbound DTR; traffic detoured to eastbound DIAAH.
Where:  Lane closures begin at mile marker 0.8 (3/10 mile after the Rudder Road overpass), with traffic detouring to the eastbound DIAAH just past the mainline toll booth. Eastbound DTR traffic will return to the toll road lanes at mile marker 2.7 (1/10 mile past the Centreville Road bridge. Traffic to Centreville Road will use the Fairfax County Parkway and Sunrise Valley Drive. Follow detour signage.
Why:     Pedestrian bridge construction
 
{"gmap":{"map":{"options":{"center":"(38.95697065132556, -77.40370426689313)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.9627290905068, -77.42269277572632)"},"marker1":{"position":"(38.95670572136157, -77.40312337875366)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 
Dulles Toll Road West
 
When:   Monday, Jan. 8, 8 p.m. to 5 a.m.
What:    Left lane closure
Where:  From mile marker 2.5 to 1.7 (from the Centreville Road overpass to 5/10 mile before the Route 28 overpass)
Why:     Civil work
{"gmap":{"map":{"options":{"center":"(38.963891155905614, -77.42329504586792)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.957172926268804, -77.40434646639187)"},"marker1":{"position":"(38.962578929632656, -77.42104053497314)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 
Dulles International Airport Access Highway (DIAAH) East
When:   Monday, Jan. 8 - Tuesday, Jan. 9, 9 p.m. to 5 a.m.
What:    Full closure of eastbound DIAAH; traffic detoured to eastbound DTR. No toll will
         be charged to airport traffic.
Where:  Lane closures begin at mile marker 0.8 (3/10 mile after the Rudder Road overpass), with traffic detouring to the eastbound DTR just past the mainline toll booth. Airport traffic will return to the eastbound DIAAH at mile marker 2.2 (3/10 mile before the Centreville Road bridge.  Follow detour signage.
Why:     Pedestrian bridge construction
 
{"gmap":{"map":{"options":{"center":"(38.95792640121136, -77.40654722109298)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.9625622455806, -77.43719816207886)"},"marker1":{"position":"(38.95770687082601, -77.40715742111206)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Monday, Jan. 8, 7 p.m. to 5 a.m.
What:    Left lane closure
Where:  From mile marker 2.5 to 1.7 (from the Centreville Road overpass to 5/10 mile before the Route 28 overpass)
Why:     Civil work
 
{"gmap":{"map":{"options":{"center":"(38.96155532236854, -77.41696503259277)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.956814180157984, -77.40475416183472)"},"marker1":{"position":"(38.96098553630665, -77.41650223993929)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.