Skip to main content
Silver Line on Track

Daily Traffic Reminder for May 23

May 23,  2017
 
CONTACT:      Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures Tonight on the Dulles Greenway - Tuesday, May 23
 
Nighttime construction activities will take place on Tuesday, May 23, causing lane closures on the Dulles Greenway.
 
See below for more detailed information.  All work is weather permitting.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
Dulles Greenway (East)
 
When:   Tuesday, May 23, 8 p.m. to 10 p.m.
What:    Two left lanes closed
Where:  From mile marker 10.0 to 12.0 (from 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza). 
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.97698708167208, -77.4450316677246)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.99820818409336, -77.48009204864502)"},"marker1":{"position":"(38.97946169151752, -77.45176792144775)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway (West)
 
When:   Tuesday, May 23, 8 p.m. to 10 p.m.
What:    Two left lanes closed
Where:  From mile marker 13.0 to 11.0 (from 6/10 mile before the main line toll booth to the Old Ox Road overpass). 
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.98801247371209, -77.45372202493286)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.969319170917714, -77.43533134460449)"},"marker1":{"position":"(38.98946933380469, -77.45773315429688)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.