|
May 25, 2017
CONTACT: Marcia McAllister
T: 703-572-0506
C: 571-730-9117
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures Tonight on the Dulles Greenway and Airport Roads - Thursday, May 25
Nighttime construction activities will take place on Thursday, May 25, causing lane closures on the Dulles Greenway and airport roads.
See below for more detailed information. All work is weather permitting.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
Dulles Greenway (East)
When: Thursday, May 25, 8 p.m. to 10 p.m.
What: Two right lanes closed
Where: From mile marker 10.0 to 12.0 (from 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza).
Why: Aerial guideway construction
Dulles Greenway (West)
When: Thursday, May 25, 8 p.m. to 10 p.m.
What: Two left lanes closed
Where: From mile marker 13.0 to 11.0 (from 6/10 mile before the main line toll booth to the Old Ox Road overpass).
Why: Aerial guideway construction
Aviation Drive East and West
When: Thursday, May 25 - Friday, May 26, 6 p.m. to 5 a.m.
What: Alternating right and left lane closures
Where: From the ramp to the eastbound DIAAH to the ramp to the westbound DIAAH (along the Aviation Drive bridge over the DIAAH)
Why: Aerial guideway construction
<><><><><>
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.
|