Skip to main content
Silver Line on Track

Daily Traffic Reminder for Nov.1

Nov. 1,  2017
 
CONTACT: Marcia McAllister
                   T: 703-572-0506
                   C: 571-730-9117
                   marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane and Ramp Closures Overnight on the Dulles Toll Road, Dulles International Airport Access Highway and at Dulles Airport - Wednesday, Nov. 1
 
Nighttime construction activities will take place overnight on Wednesday, Nov. 1, causing lane, ramp and road closures on the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH) and at Dulles International Airport.
 
See below for more detailed information.  All work is weather permitting.
 
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
 
Dulles Toll Road East
 
When:   Wednesday, Nov. 1, 10 p.m. to 5 a.m.
What:    Two left lanes closed
Where:  From mile marker 3.0 to 4.0 (from 4/10 mile past the Centreville Road bridge to 2/10 mile before the Fairfax County Parkway overpass)
Why:     Utility work
 
{"gmap":{"map":{"options":{"center":"(38.95161465534979, -77.37718787290191)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.95514556858487, -77.40045189857483)"},"marker1":{"position":"(38.95264257794025, -77.37708449363708)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Toll Road West
 
When:   Wednesday, Nov. 1, 10 p.m. to 5 a.m.
What:    Two right lanes closed
Where:  From mile marker 2.8 to 1.7 (from 2/10 mile before the Centreville Road bridge to 5/10 mile before the Route 28 overpass)
Why:     Pedestrian bridge installation
 
{"gmap":{"map":{"options":{"center":"(38.96254388988984, -77.42407288648224)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.9556628422956, -77.40208268165588)"},"marker1":{"position":"(38.96223689534233, -77.42299318313599)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Wednesday, Nov. 1, 10 p.m. to 5 a.m.
What:    Full closure
Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass). Follow detour.
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.957083654785336, -77.44097616769409)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.9554375784018, -77.44648933410645)"},"marker1":{"position":"(38.962045021724805, -77.44224071502686)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Wednesday, Nov. 1, 6 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 3.5 to 5.0 (from 1/10 past the Monroe Street/Van Buren Street overpass to 2/10 mile before the Reston Parkway overpass)
Why:     Civil work
 
{"gmap":{"map":{"options":{"center":"(38.951681403881764, -77.3580047140274)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.95289288098269, -77.38725543022156)"},"marker1":{"position":"(38.95244233486982, -77.35869526863098)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Wednesday, Nov. 1, 10 p.m. to 5 a.m.
What:    Full closure
Where:  From mile marker 0.4 to Saarinen Circle (from 1/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1); traffic will be diverted around work area.
Why:    Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.95693765341923, -77.4513885030899)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.95704778235266, -77.45011568069458)"},"marker1":{"position":"(38.96151110979358, -77.44309902191162)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Aviation Drive East and West
 
When:   Wednesday, Nov. 1, 6 p.m. to 5 a.m.
What:    Alternating right and left lane closures
Where:  From Autopilot Drive to the transition of Aviation Drive to Cargo Drive
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.95763011437698, -77.45028343297577)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.958174069068924, -77.44985818862915)"},"marker1":{"position":"(38.95714789745234, -77.45301246643066)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 <><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.