Skip to main content
Silver Line on Track

Daily Traffic Reminder for Nov. 3

Nov. 3,  2017
 
CONTACT: Marcia McAllister
                   T: 703-572-0506
                   C: 571-730-9117
                   marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane and Ramp Closures Overnight on the Dulles Toll Road, Dulles International Airport Access Highway -  Tonight, Friday, Nov. 3
 
Nighttime construction activities will take place overnight on Friday, Nov. 3, causing lane, ramp and road closures on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH).
 
See below for more detailed information.  All work is weather permitting.
 
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
 
Dulles Toll Road East
 
When:   Friday, Nov. 3, 10 p.m. to 6 a.m.
What:    Three left lanes closed, then full closure
Where:  Left lane closures on the eastbound DTR will begin at 8 p.m. at mile marker 1.7 (near the mainline toll booth). The slip ramp from the eastbound DIAAH to the DTR at mile marker 2.7 (after the Centreville Road bridge) will be closed.  Signage will be in place to direct Fairfax County Parkway traffic to the slip ramp at mile marker 1.8 (immediately after the mainline toll booth). Eastbound DTR traffic will be reduced to a single lane between the Centreville Road overpass and the Monroe/Van Buren Street overpass, then diverted through the Herndon-Monroe Park & Ride.  Traffic will return to the eastbound DTR 1/10 mile before the Fairfax County Parkway overpass with all lanes open to traffic.  Follow detour.
Why:     Pedestrian bridge concrete pour
 
{"gmap":{"map":{"options":{"center":"(38.97607378195902, -77.44352426625824)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.97559169057177, -77.4441933631897)"},"marker1":{"position":"(38.975116266385896, -77.4427878856659)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Toll Road West
 
When:   Friday, Nov. 3, 10 p.m. to 6 a.m.
What:    Single lane closures start at 8 p.m., transitioning to full closure at 10 p.m.
Where:  Left lane closures will begin near mile marker 4.0 (west of the Fairfax County Parkway overpass).  At 10 p.m., all traffic will be diverted to local roads at Centreville Road (Exit 10, mile marker 2.6). Follow detour to Centreville Road South, Frying Pan Road West and Route 28 North to access Dulles International Airport and the Dulles Greenway.
Why:     Pedestrian bridge installation
 
{"gmap":{"map":{"options":{"center":"(38.9502671559068, -77.39510234691238)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95283030530494, -77.37453639507294)"},"marker1":{"position":"(38.95670572136157, -77.40495800971985)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Friday, Nov. 3, 6 p.m. to 5 a.m.
What:    Right lane closed
Where:  From Saarinen Circle to mile marker 0.2 (prior to the Rudder Road overpass)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.961179913366045, -77.44433429338073)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95545426464071, -77.44651079177856)"},"marker1":{"position":"(38.96169464247375, -77.44292736053467)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Friday, Nov. 3, 10 p.m. to 6 a.m.
What:    Full closure
Where:  From mile marker 9.0 to 1.8 (from 2/10 past the Beulah Road overpass to 6/10 mile before the Route 28 overpass). Follow detour to westbound DTR. At mile marker 2.6, all traffic will be diverted to local roads at Centreville Road (Exit 10). Follow detour to Centreville Road South, Frying Pan Road West and Route 28 North to access Dulles International Airport and the Dulles Greenway.
Why:     Pedestrian bridge installation
 
{"gmap":{"map":{"options":{"center":"(38.96016629913118, -77.4143317738924)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.94257131896985, -77.28559970855713)"},"marker1":{"position":"(38.96000946091627, -77.41378784179688)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 
 <><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.