Skip to main content
Silver Line on Track

UPDATE: Daily Traffic Reminder for Feb. 26

Feb. 26, 2018
 
CONTACT: Marcia McAllister
                   T: 703-572-0506
                   C: 571-730-9117
                   marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Nighttime Construction on Eastbound Dulles Greenway Will Cause Intermittent 10-minute Closures of Exit 8A (Old Ox Road - Rte. 606 Westbound) - Monday, Feb. 26
 
Tonight, Monday, Feb. 26, from 9 p.m. to 3 a.m., Exit 8A to westbound Old Ox Road (Rte.606) from the eastbound Dulles Greenway, will close approximately 10-15 minutes intermittently while Dulles Corridor Metrorail Project crews take delivery of and off-load a large pre-fabricated building that will house Silver Line systems elements.
 
During any stoppages, westbound Rte. 606 traffic will be diverted to Exit 8B (Old Ox Road-Rte. 606). Detour signage will instruct drivers to turn onto Rte. 606 east and, in approximately 3/10 miles, make a U-turn at the first stop light (Moran Road) onto Rte. 606 west. Normal traffic patterns will resume between stoppages. Please refer to the drawing below.
 
 
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com
or 703-572-0506.