Skip to main content
Silver Line on Track

Triple Left Lane Closure with 20-Minute Stoppages on Westbound Dulles Toll Road for Pedestrian Bridge Work Saturday, July 20, 11 p.m. to Sunday, July 21, 5 a.m.

July 17, 2019
 
 
CONTACT: Marcia McAllister                                                                
                   T: 703-572-0506                                                                  
                   C: 571-730-9117
                   Marcia.McAllister@dullesmetro.com
 
Triple Left Lane Closure with 20-Minute Stoppages on Westbound Dulles Toll Road for Pedestrian Bridge Work
Saturday, July 20, 11 p.m. to Sunday, July 21, 5 a.m.
 
Beginning on or about Saturday, July 20 at 11 p.m. and continuing through Sunday, July 21 at 5 a.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing pedestrian bridge utility work along the westbound Dulles Toll Road (DTR), requiring the full closure of three left lanes beginning at mile marker 3.7 at Herndon Station, and continuing through mile marker 1.8 to the west end of Innovation Station. Traffic from the westbound DTR should be aware of the change in pattern and can expect up to 20 minute full stoppages (see image below).
 
All work is weather dependent and subject to change. Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the highway at various times.
 
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.