Skip to main content
Silver Line on Track

Ashburn

The Ashburn Silver Line Station will serve Ashburn, Loudoun Station development, Moorefield Station development, and Brambleton.

{"gmap":{"map":{"options":{"center":"(39.00627314971597, -77.49228146173095)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(39.00521182696718, -77.49144315719604)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}Ashburn Station Statistics

Location
In the median of the Dulles Greenway near the intersection Route 772 (Ryan Road)
Type of Station
Ground level
Station Facilities
  • Pedestrian bridges and station entrances from both sides of Dulles Greenway
  • Bus drop-off/pickup (both sides)
  • Kiss & Ride (both sides)
  • Parking for approximately 3,000 cars (1,500 on each side)
  • 24 bicycle racks, including 11 in the parking structure) and 5 bike lockers on the north side; 27 bicycle racks on the south side
Scheduled to complete
Phase 2 construction will be complete in the next five years. Opening dates to be determined by the Metropolitan Washington Area Transit Authority
Landmarks
Ashburn, Loudoun Station development, Moorefield Station development, Brambleton
Fares
Will be set when Phase 2 opens, and will be similar to other Metrorail lines
Schedule
Trains are anticipated to run every six minutes in the peak period (rush hours) and less frequently in the off peak

Alerts Sign Up

Sign up to have traffic alerts delivered to your email in-box through our Alerts Sign Up Form.