|
Oct. 10, 2017
CONTACT: Marcia McAllister
T: 703-572-0506
C: 571-730-9117
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures Tonight on the Dulles International Airport Access Highway, Dulles Greenway and Airport Roads - Tuesday, Oct. 10
Nighttime construction activities will take place on Tuesday, Oct. 10, causing lane closures on the Dulles International Airport Access Highway (DIAAH), Dulles Greenway and airport roads.
See below for more detailed information. All work is weather permitting.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
<><><>
Dulles International Airport Access Highway (DIAAH) East
When: Tuesday, Oct. 10, 7 p.m. to 5 a.m.
What: Left lane closed at 7 p.m., full closure begins at 10 p.m. Follow detour.
Where: From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why: Aerial guideway construction
When: Tuesday, Oct. 10, 6 p.m. to 5 a.m.
What: Right lane closed
Where: From mile marker 4.4 to 5.0 (from 2/10 mile past the Fairfax County Parkway overpass to 2/10 mile before the Reston Parkway overpass)
Why: Civil work
Dulles International Airport Access Highway (DIAAH) West
When: Tuesday, Oct. 10, 7 p.m. to 5 a.m.
What: Two left lanes closed at 7 p.m., full closure begins at 10 p.m. Follow detour.
Where: From mile marker 0.4 to Saarinen Circle (from 1/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.
Why: Aerial guideway construction
Autopilot Drive North
When: Tuesday, Oct. 10, 9 p.m. to 5 a.m.
What: Left lane closed
Where: From Rudder Road to the Hertz car rental facility
Why: Aerial guideway construction
Autopilot Drive South
When: Tuesday, Oct. 10, 9 p.m. to 5 a.m.
What: Left lane closed
Where: From the Hertz car rental facility to Rudder Road
Why: Aerial guideway construction
Dulles Greenway East
When: Tuesday, Oct. 10, 8 p.m. to 5 a.m.
What: Two right lanes closed
Where: From mile marker 10.0 to 12.0 (from 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why: Aerial guideway construction
<><><><><>
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.
|