|
March 23, 2017
CONTACT: Marcia McAllister
T: 703-572-0506
C: 571-730-9117
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles International Airport Access Highway, Dulles Greenway and Airport Roads - Thursday, March 23
Nighttime construction activities will take place Thursday, March 23, causing lane closures and detours on the Dulles International Airport Access Highway, Dulles Greenway and airport roads.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
See below for more detailed information. All work is weather permitting.
Dulles International Airport Access Highway (DIAAH) East
When: Thursday, March 23 - Friday, March 24, 10 p.m. to 5 a.m.
What: Full closure begins at 10 p.m.; follow detour. Road reopens at 5 a.m.
Where: From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why: Aerial guideway construction
When: Thursday, March 23 - Friday, March 24, 6 p.m. to 5 a.m.
What: Left lane closed
Where: From mile marker 3.3 to 3.9 (from 1/10 mile before the Monroe/Van Buren Street overpass to 3/10 mile before the Fairfax County Parkway overpass)
Why: Construction entrance acceleration/deceleration lane
Dulles International Airport Access Highway (DIAAH) West
When: Thursday, March 23 - Friday, March 24, 7 p.m. to 5 a.m.
What: Two right lanes closed
Where: From mile marker 2.3 to 1.4 (from 2/10 mile past the Centreville Road bridge to 2/10 mile before the Route 28 overpass). Single right lane closed from 7 p.m. to 10 p.m., transitioning to two right lanes closed from 10 p.m. to 5 a.m.
Why: Overhead sign installation
When: Thursday, March 23 - Friday, March 24, 10 p.m. to 5 a.m.
What: Full closure
Where: From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.
Why: Aerial guideway construction
Aviation Drive East and West
When: Thursday, March 23 - Friday, March 24, 6 p.m. to 5 a.m.
What: Left lanes closed
Where: Between the ramps to and from the Dulles International Airport Access Highway
Why: Aerial guideway construction
Dulles Greenway East
When: Thursday, March 23 - Friday, March 24, 8 p.m. to 5 a.m.
What: Two right lanes closed
Where: From mile marker 10.0 to 12.0 (from the 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why: Aerial guideway construction
<><><><><>
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.
|