Skip to main content

Important Lane and Ramp Closures for the Week of July 21 - July 27

July 19, 2019
                
                                                                     
CONTACT:Marcia McAllister
                  T: 703-572-0506
                  C: 571-730-9117
                  marcia.mcallister@dullesmetro.com
 
Important Lane and Ramp Closures for the Week of July 21 - July 27
 
Dulles Corridor Metrorail Project crews continue construction activities for the Metrorail Silver Line Phase 2 that require lane, shoulder, and road closures and detours at locations along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway, Autopilot Drive, Herndon Parkway, Edmund Halley Drive, Sunrise Valley Drive, Sunset Hills Road, Lockridge Road, and Moran Road during the week of July 21 - July 27, 2019. In addition, there will be lane closures along the Phase 1 alignment as listed below.
 
See below for more specific dates, times and details and remember that all work is weather permitting.
 
PLEASE USE CAUTION and remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
Dulles Toll Road East
When:   Monday, July 22 to Friday, July 26, 10 a.m. to 3:30 p.m. and 9 p.m. to 5 a.m., and Saturday, July 27 to Sunday, July 28, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 1.3 to 5.2 (from just west of the Route 28 overpass to the Reston Parkway overpass)
Why:     Civil work
 
When:   Sunday, July 21 to Saturday, July 27, 9 p.m. to 5 a.m.
What:    Alternating double right and left lane closures of varying lengths
Where:  From mile marker 1.2 to 4.1 (from Route 28 to Fairfax County Parkway)
Why:     Milling, Paving, Striping
 
When:   Sunday, July 21 to Saturday, July 27, 10 p.m. to 5 a.m.
What:    Alternating triple left and right lane closures with up to 20 minute stoppages after midnight
Where:  From mile marker 1.9 to 4.5 (from Innovation Station to Fairfax County Parkway)
Why:     Milling, Paving, Striping
 
Dulles Toll Road West
When:   Monday, July 22 to Friday, July 26, 9 a.m. to 3 p.m. and 8 p.m. to 5 a.m., and Saturday, July 27, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 5.7 to 1.5 (between the Route 28 and Reston Parkway overpasses)
Why:     Civil work
 
When:   Sunday, July 21 to Saturday, July 27, 9 p.m. to 5 a.m.
What:    Alternating double right and left lane closures of varying lengths
Where:  From mile marker 3.4 to 1.5 (from Van Buren Street to Route 28)
Why:     Milling, paving, striping
 
Dulles International Airport Access Highway (DIAAH) East
When:   Monday, July 22 to Friday, July 26, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m., and Saturday, July 27 to Sunday, July 28, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 0.0 to 8.0 (from the Aviation Drive overpass to Hunter Mill Road)
Why:     Civil work
 
When:   Sunday, July 21 to Saturday, July 27, 12 a.m. to 11:59 p.m.
What:    Left shoulder closure
Where:  From mile marker 3.5 to 5.5 (from Van Buren Street to 3/10 mile east of Reston Parkway)
Why:     Storm sewer flushing
 
When:   Sunday, July 21, 12:00 a.m. to Saturday, July 27, 5 p.m.
What:    Slip ramp closure
Where: Mile marker 1.7
Why:     Sanitary sewer work
 
Dulles International Airport Access Highway (DIAAH) West
When:   Monday, July 22 to Friday, July 26, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m., and Saturday, July 27 to Sunday, July 28, 5 a.m. to 2 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 7.3 to 0.0 (from approximately 7/10 mile west of Hunter Mill Road to approximately 200 feet beyond the Copilot Way ramp on Saarinen Circle near the Dulles Airport Terminal)
Why:     Civil and Dulles Airport Metrorail Station work will be taking place within the closures
 
When:   Friday, July 26, 10 p.m. to Monday, July 29, 5 a.m
What:    Detour
Where:  From mile marker 9.1 to 1.7 (from Beluah Road to Route 28)
Why:     Facilities/Civil work
 
When:   Sunday, July 21 to Saturday, July 27, 12 a.m. to 11:59 p.m
What:    Left shoulder closure
Where:  From mile marker 3.5 to 5.5 (from Van Buren Street to 3/10 mile east of Reston Parkway)
Why:     Storm sewer flushing
 
Rudder Road North and South
When:   Monday, July 22 to Friday, July 26, 7:30 a.m to 2 p.m. and 6 p.m. to 5 a.m., and Saturday, July 27, 6 a.m. to 2 p.m. and 6 p.m. to 5 a.m.
What:    Ramp narrows
Where:  From 1000' before Rudder Road bridge to the end of Rudder Road bridge
Why:     Bridge fence installation
 
Dulles Greenway East
When:   Monday, July 22 to Friday, July 26, 10 a.m. to 6 p.m. and 6 p.m. to 5 a.m., and Saturday, July 27, 6 a.m. to 6 p.m. and 6 p.m. to 5 a.m.
What:    Alternating left and right lane closures of varying lengths
Where:  From mile marker 7.6 to 14.0 (from approximately 2/10 mile west of Waxpool Road to the Dulles Toll Road)
Why:     Civil work
 
When:   Wednesday, July 23 to Saturday, July 27, 9 p.m. to 5 a.m.
What:    Alternating double left and right lane closures of varying lengths
Where:  From mile marker 10.0 to 11.1 (from Loudoun County Parkway to Old Ox Road)
Why:     Bridge fence installation 
 
Dulles Greenway West
When:   Monday, July 22 to Friday, July 26, 6 a.m. to 3 p.m. and 8 p.m. to 6 a.m., and Saturday, July 27, 6 a.m. to 6 p.m. and 8 p.m. to 6 a.m.
What:    Alternating left and right lane closures of varying lengths
Where:  From mile marker 12.2 to 7.6 (from the Moran Road exit to Broadlands Boulevard overpass)
Why:     Civil work
 
When:   Wednesday, July 23 to Saturday, July 27, , 9 p.m. to 5 a.m.
What:    Alternating double left and right lane closures of varying lengths
Where:  From mile marker 12.0 to 11.0 (from the main toll plaza to Old Ox Road)
Why:     Bridge fence installation
 
Herndon Parkway East
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m.
What:    Right lane closed
Where: From 1000 feet east of Van Buren Street to 800 feet west of Exchange Place
Why:     Material Delivery
 
Sunrise Valley Drive East & West
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m.
What:    Right lane closed
Where: From Dulles Technology Drive to Dulles Station Blvd
Why:     Civil Work
 
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m. and Saturday, July 27, 7 a.m. to 3:30 p.m.
What:    Right lane closed
Where: From Thunder Chase Drive to Colts Brook Drive
Why:     Civil Work
 
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m. and Saturday, July 27, 7 a.m. to 3:30 p.m.
What:    Right lane closed
Where: From Reston Pkwy to 200' West of Edmund Halley Dr.
Why:     Civil Work
 
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m. and Saturday, July 27, 7 a.m. to 3:30 p.m.
What:    Right turn lane & Right lane closed
Where: Intersection of Sunrise Valley Drive and Reston Parkway
Why:     Civil Work
 
When:   Monday, July 22 to Friday, July 26, 12 a.m. to 5 a.m.
What:    Right lane closed
Where: Thunder Chase Drive
Why:     Civil work
 
When:   Monday, July 22 to Friday, July 26, 12 a.m. to 5 a.m.
What:    Right lane closed
Where: Millburn Lane
Why:     Civil work
 
Sunset Hills Road East
When: Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m. and Saturday, July 27, 7 a.m to 3:30 p.m.
What:    Alternating right and left lane closures
Where:  From 400 feet west of Town Center Pkwy to Bechtel Building Entrance
Why:     Civil work
 
Edmund Halley Drive North and South
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m. and Saturday, July 27, 7 a.m. to 3:30 p.m.
What:    Right shoulder closed
Where:  From Sunrise Valley Drive to 1000 feet north of Sunrise Valley Drive
Why:     Civil utility work
 
Moran Road South
When:   Sunday, July 21 to Saturday, July 27, 7 a.m. to 5:30 p.m.
What:    Alternating left and right lane closures
Where:  From Moran Road to Old Ox Road
Why:     Civil work
 
Old Ox Road East and West
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m.; Friday, July 26, 9:30 a.m. to 2 p.m.; Tuesday, July 23 to Thursday July 25, 10 p.m. to 4 a.m.; and Friday, July 26 to Sunday, July 28, 11 p.m. to 5 a.m.
What:    Right lane closure
Where:  From 1000' east of Old Ox Road bridge to 1000' west of bridge
Why:     Fence installation
 
When:   Monday, July 22 to Thursday, July 25, 9:30 a.m. to 3:30 p.m., and Friday, July 26, 9:30 a.m. to 2 p.m.
What:    Left lane closure
Where:  From 1000' east of Old Ox Road Bridge to the Dulles Greenway NB On-Ramp
Why:     Curb repairs
 
Lockridge Road North and South
When:   Sunday, July 21 to Saturday, July 27, 12 a.m. to 11:59 p.m.
What:    Road closure
Where:  From Dulles North Transit Center Park & Ride to Prentice Drive
Why:     Civil work
 
Old Meadow Road - East
When:  Monday, July 22, through Thursday, July 25, 9 a.m. - 3:30 p.m.
Friday, July 26, 9 a.m. - 2 p.m.
What:   Right lane closure
Where: From Route 123 to Colshire Meadow Road
Why:    Utility relocation work
 
Route 123 - South
When:  Monday, July 22, through Thursday, July 25, 9 a.m. - 3:30 p.m.
Friday, July 26, 9 a.m. - 2 p.m.
What:    Left turn lane closure
Where:  From Route 123 to Old Meadow Road
Why:     Utility relocation work
 
Route 123 - North
When:  Monday, July 22, through Thursday, July 25, 9 a.m. - 3:30 p.m.
Friday, July 26, 9 a.m. - 2 p.m.
What:    Right turn lane closure
Where:  From Old Meadow Road to Route 123
Why:     Utility relocation work
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.