June 17, 2016
CONTACT: Marcia McAllister
T: 703-572-0506
C: 571-730-9117
Important Lane and Ramp Closures for the
Week of June 19 - June 25
Phase 2 Dulles Corridor Metrorail Project crews are continuing road widening, lane shifting, utility work, excavation and other construction activities for the Metrorail Silver Line, Phase 2. Lane and shoulder closures will occur along the Dulles Toll Road, Dulles International Airport Access Highway, Rudder Road, Dulles Greenway, Sunrise Valley Drive and Sunset Hills Road during the week of June 19 – June 25.
On or about Friday, June 17 at 10 p.m. to Sunday, June 19 at 10 p.m., the left lane of the eastbound Dulles International Airport Access Highway between the Fairfax County Parkway overpass and the Reston Parkway overpass will be closed. On or about Saturday, June 18, and Sunday, June 19, from 2 a.m. to 2 p.m. each day, the left lane of the westbound DIAAH will be closed. Signage will be in place at several key entry points to the westbound DIAAH to notify drivers and inform them of the option to use the Dulles Toll Road. These closures are required for the erection of a tower crane at the Reston Town Center Station site. Drivers are asked to use caution and remain attentive to all signage, barricades, adjusted speed limits. Large, slow-moving vehicles may be exiting and entering the highway at various times. All work is weather permitting.
See below for more detailed information.
<><><>
Dulles Toll Road East
When: Sunday, June 19 - Saturday, June 25, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 1.3 to 3.3 (from 1/10 mile past the Route 28 overpass to 1/10 mile before the Monroe Street overpass) Why: Jack and bore, duct bank work
When: Sunday, June 19 - Saturday, June 25, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 3.3 to 5.2 (from 1/10 mile before the Monroe Street overpass to the Reston Parkway overpass) Why: Jack and bore operations
Dulles Toll Road West When: Sunday, June 19 - Friday, June 24, 9:30 a.m. to 3 p.m. and 8 p.m. to 5 a.m. Saturday, June 25, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 5.7 to 3.3 (from 5/10 mile before the Reston Parkway overpass to 1/10 mile past the Monroe Street overpass) Why: Jack and bore operations
When: Sunday, June 19 - Friday, June 24, 9:30 a.m. to 3 p.m. and 8 p.m. to 5 a.m. Saturday, June 25, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m. What: Left lane closed Where: From mile marker 3.5 to 1.5 (from 1/10 mile before the Monroe Street overpass to 3/10 mile before the Route 28 overpass) Why: Jack and bore operations
Dulles International Airport Access Highway (DIAAH) East
When: Sunday, June 19 - Saturday, June 25, 9 p.m. to 5 a.m. What: Eastbound lane reductions begin at 9 p.m. Eastbound full closure begins at 10 p.m. Road reopens at 5 a.m. Follow detour. Where: From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass) Why: Installation of a concrete span across the eastbound DIAAH.
When: Sunday, June 19 - Friday, June 24, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m. Saturday, June 11, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 0.0 to 2.3 (from Saarinen Circle to 2/10 mile before the Centreville Road overpass) Why: Construction entrance acceleration/deceleration lane
When: Sunday, June 19 - Friday, June 24, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m. Saturday, June 25, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 3.3 to 5.4 (from 1/10 mile before the Monroe Street overpass to 2/10 mile past the Reston Parkway overpass) Why: Construction entrance acceleration/deceleration lane
When: Friday, June 24 – Sunday, June 26, 6 p.m. to 2 p.m. What: Left lane closed Where: From mile marker 0.1 to 1.0 (from Saarinen circle before Aviation Drive Overpass to Horsepen Run Bridge) Why: Asphalt paving
Dulles International Airport Access Highway (DIAAH) West
When: Sunday, June 19 - Friday, June 24, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m. Saturday, June 25, 5 a.m. to 2 p.m. and 7 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 3.3 to 0.3 (from 1/10 mile past the Monroe Street overpass to 2/10 mile past the Rudder Road overpass) Why: Duct bank work
When: Sunday, June 19 - Friday, June 24, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m. Saturday, June 25, 5 a.m. to 2 p.m. and 7 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 5.7 to 3.3 (from 5/10 mile before the Reston Parkway overpass to 1/10 mile past the Monroe Street overpass) Why: Road work
When: Sunday, June 19 - Friday, June 24, 8 a.m. to 2 p.m. and 7 p.m. to 5 a.m. Saturday, June 25, 5 a.m. to 2 p.m. and 7 p.m. to 5 a.m. What: Alternating right and left lane closures of varying lengths Where: From mile marker 0.3 to 200 feet past the ramp to Copilot Way, including ramps in the vicinity (from 2/10 mile past the Rudder Road overpass to Saarinen Circle past Garage 1) Why: Construction entrance acceleration/deceleration lane
When: Sunday, June 19 - Saturday, June 25, 10 p.m. to 5 a.m. What: Full closure of westbound DIAAH Where: From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area. Why: Installation of a concrete span across the westbound DIAAH.
Dulles Greenway East When: Tuesday, June 21, Wednesday, June 22, Thursday, June 23, Friday, June 24, What: Alternating right and left lane closures of varying lengths Where: Between mile marker 7.6 and 14.0 (from Broadlands Boulevard to the end of the ramp to the eastbound Dulles Toll Road), short lane closures of varying lengths will occur Why: Road work
When: Tuesday, June 21 - Wednesday, June 22, 11 a.m. to 7 p.m. What: Two left lanes closed Where: Between mile marker 10 and 11.0 (from Loudoun County Parkway and Route 606/West Ox Road) Why: Bridge work
Dulles Greenway West
When: Monday, June 20, Thursday, June 23, and Friday, June 24, 6 a.m. to 3 p.m. and 8 p.m. to 6 a.m. Saturday, June 25, 6 a.m. to 6 p.m. and 6 p.m. to 12 p.m. What: Alternating right and left lane closures of varying lengths Where: Between mile marker 12.2 and 7.6 (from 2/10 mile after the mainline toll plaza to Broadlands Boulevard), short lane closures of varying lengths will occur Why: Road work
When: Monday, June 20 and Thursday, June 23, 7 a.m. to 3 p.m. What: Two left lanes closed Where: Between mile marker 11 and 10.2 (between Route 606/West Ox Road and Loudoun County Parkway) Why: Bridge work
Sunset Hills Road East
When: Monday, June 20 – Thursday, June 23, 9:30 a.m. to 3:30 p.m. Friday, June 24, 9:30 a.m. to noon What: Right lane closed Where: Between the Fairfax County Parkway and Reston Parkway Why: Excavation
Sunrise Valley Drive West
When: Monday, June 20 – Saturday, June 25, 8:30 a.m. to 3:30 p.m. What: Right lane closed Where: Westbound Sunrise Valley Drive from Dulles Technology Boulevard to 550 feet past Dulles Station Boulevard Why: Construction Deliveries <><><><><>
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.
|