|
May 08, 2020
CONTACT: Marcia McAllister
T: 703-572-0506
C: 571-730-9117
Important Lane and Ramp Closures for the
Week of May 10 - May 16
Dulles Corridor Metrorail Project crews continue construction activities for the Metrorail Silver Line Phase 2 that require lane, shoulder, and road closures and detours at locations along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway, Autopilot Drive, Herndon Parkway, Edmund Halley Drive, Sunrise Valley Drive, Sunset Hills Road, and Moran Road during the week of May 10 - May 16, 2020. In addition, there will be lane closures along the Phase 1 alignment as listed below.
See below for more specific dates, times and details and remember that all work is weather permitting. PLEASE USE CAUTION and remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
<><><>
Dulles Toll Road East
When: Sunday, May 10 to Saturday, May 16, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What: Alternating right and left lane closures of varying lengths
Where: From mile marker 1.3 to 5.2 (from just west of the Route 28 overpass to the Reston Parkway overpass)
Why: Civil work
When: Monday, May 11 to Friday, May 15, 10 a.m. to 3:30 p.m.
What: Partial closure of exit ramp
Where: Reston Parkway Exit
Why: Materials delivery
When: Monday, May 11 to Friday, May 15, 10 a.m. to 3:30 p.m.
What: Partial closure of exit ramp
Where: Near the Van Buren/Monroe Overpass
Why: Paving
When: Monday, May 11 to Friday, May 15, 10 a.m. to 3:30 p.m.
What: Single right lane closure and partial closure of exit ramp
Where: From the Dulles Toll Road ramp to 200 feet prior to the end of Dulles Toll Road ramp
Why: Equipment pick up/drop off
Dulles Toll Road West
When: Monday, May 11 to Friday, May 15, 9 a.m. to 3 p.m. and 8 p.m. to 5 a.m.
Saturday, May 16, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What: Alternating right and left lane closures of varying lengths
Where: From mile marker 5.7 to 1.5 (between the Route 28 and Reston Parkway overpasses)
Why: Civil work
When: Monday, May 11 to Friday, May 15, 9 a.m. to 3:30 p.m.
What: Right lane shoulder closure
Where: Near Fairfax County Parkway
Why: Fence installation
Dulles International Airport Access Highway (DIAAH) East
When: Monday, May 11 to Friday, May 15, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m. Saturday, May 16 to Sunday, April 12, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m.
What: Alternating right and left lane closures of varying lengths
Where: From mile marker 0.0 to 8.0 (from the Aviation Drive overpass to Hunter Mill Road)
Why: Civil work
Dulles International Airport Access Highway (DIAAH) West
When: Monday, May 11 to Friday, May 15, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m.
Saturday, May 16 to Sunday, April 12, 5 a.m. to 2 p.m. 8 p.m. to 5 a.m.
What: Alternating right and left lane closures of varying lengths
Where: From mile marker 7.3 to 0.0 (from approximately 7/10 mile west of Hunter Mill Road to approximately 200 feet beyond the Copilot Way ramp on Saarinen Circle near the Dulles Airport Terminal)
Why: Civil and Dulles Airport Metrorail Station work will be taking place within the closures
Dulles Connector Road - West
When: Monday, May 11 through Thursday, May 14, 8 a.m. - 3:30 p.m., and
Friday, May 15, 8 a.m. - 2 p.m.
What: Left shoulder closure
Where: From West Falls Church Metro Station exit ramp to bus ramp of West Falls Church Metro Station
Why: Seed and sod installation
Dulles Greenway East
When: Monday, May 11 to Friday, May 15, 10 a.m. to 6 p.m. and Saturday, May 16, 6 a.m. to 6 p.m.
What: Alternating left and right lane closures of varying lengths
Where: From mile marker 7.6 to 14.0 (from approximately 2/10 mile west of Waxpool Road to the Dulles Toll Road)
Why: Civil work
When: Monday, May 11 to Friday, May 16, 10 a.m. to 6 p.m.
What: Alternating double left and right lane closures of varying lengths
Where: From mile marker 9.2 to 10.6 (from 5/10 mile west of Loudoun County Parkway to Broad Run Bridge)
Why: Deck Sealing
Dulles Greenway West
When: Monday, May 11 to Friday, May 15, 6 a.m. to 3 p.m. and Saturday, May 16, 6 a.m. to 6 p.m.
What: Alternating left and right lane closures of varying lengths
Where: From mile marker 12.2 to 7.6 (from the Moran Road exit to Broadlands Boulevard overpass)
Why: Civil work
Autopilot Drive North
When: Sunday, May 10 to Saturday, May 16, 9 a.m to 2 p.m.
What: Alternating single right or left lane closures
Where: From Rudder Road to Materials Road
Why: Civil Work
When: Monday, May 11 to Friday, May 16, 6 a.m. to 2:30 p.m.
What: Alternating double left and right lane closures of varying lengths
Where: From mile marker 12.2 to 10.4 (from the Moran Road exit to Broad Run Bridge)
Why: Deck Sealing
Herndon Parkway EastWhen: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m.
Friday, May 15, 9:30 a.m. to 2 p.m.
What: Right lane closed
Where: From 1000 feet east of Van Buren Street to 800 feet west of Exchange Place
Why: Material Delivery
Sunrise Valley Drive East & West
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m.
Friday, May 15, 9:30 a.m. to 2 p.m.
What: Right lane closed
Where: From Dulles Technology Drive to Dulles Station Blvd
Why: Civil Work
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m. and 10 p.m. to 4 a.m.
Friday, May 15, 9:30 a.m. to 12 p.m. and 11 p.m. to 5 a.m.
Saturday, May 16, 7 a.m. to 3:30 p.m. and 11 p.m. to 5 a.m.
What: Right lane closed
Where: From Thunder Chase Drive to Colts Brook Drive
Why: Civil Work
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m.
Friday, May 15, 9:30 a.m. to 2 p.m.
What: Right lane closed
Where: From Reston Pkwy to 200' West of Edmund Halley Dr.
Why: Civil Work
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m.
Friday, May 15, 9:30 a.m. to 2 p.m.
What: Right turn lane & Right lane closed
Where: Intersection of Sunrise Valley Drive and Reston Parkway
Why: Civil Work
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m.
Friday, May 15, 9:30 a.m. to 2 p.m.
What: Right lane closed
Where: Fairfax County Parkway
Why: Civil work
Sunset Hills Road East
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m. and 10 p.m. to 5 a.m.
Friday, May 15, 9:30 a.m. to 12 p.m. and 10 p.m. to 5 a.m.
Saturday, May 16, 7 a.m. to 3:30 p.m. and 10 p.m. to 5 a.m.
What: Alternating right and left lane closures
Where: From 400 feet west of Town Center Pkwy to Bechtel Building Entrance
Why: Civil work
When: Monday, May 11 to Friday, May 15, 8:30 a.m. to 3:30 p.m.
Friday, May 8, 8:30 a.m. to 2:30 p.m.
What: Single right lane closure
Where: From the Sunoco to Town Center Parkway
Why: Prepare for paving
Edmund Halley Drive North and South
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m.
Friday, May 15, 9:30 a.m. to 12 p.m. and Saturday, May 16, 7 a.m. to 3:30 p.m.
What: Right shoulder closed
Where: From Sunrise Valley Drive to 1000 feet north of Sunrise Valley Drive
Why: Civil utility work
Moran Road North and South
When: Monday, May 11 to Saturday, May 16, 7 a.m. to 5:30 p.m.
What: Alternating left and right lane closures
Where: From Moran Road to Old Ox Road
Why: Civil work
Old Ox Road East and West
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m. and 10 p.m. to 4 a.m.
Friday, May 15, 9:30 a.m. to 12 p.m.
What: Right lane closure
Where: From 1000' east of Old Ox Road bridge to 1000' west of bridge
Why: Fence installation
When: Monday, May 11 to Thursday, May 14, 9:30 a.m. to 3:30 p.m.
Friday, May 15, 9:30 a.m. to 12 p.m.
What: Left lane closure
Where: From 1000' east of Old Ox Road Bridge to the Dulles Greenway NB On-Ramp
Why: Curb repairs
Route 7 - East
When: Monday, May 11, through Thursday, May 14, 8.a.m. - 3 p.m., and Friday, May 15, 8 a.m. - 2 p.m.
What: Left turn lane closure
Where: From 300 feet before Westwood Center Drive to Route 7
Why: Manhole and sidewalk repairs
Route 7 - West
When: Monday, May 11, through Thursday, May 14, 8.a.m. - 3 p.m., and Friday, May 15, 8 a.m. - 2 p.m.
What: Left lane closure
Where: From 300 feet before Westpark Road to 400 feet after Westpark Road
Why: Underdrain Installation
When: Monday, May 11, through Thursday, May 14, 8.a.m. - 3 p.m., and Friday, May 15, 8 a.m. - 2 p.m.
What: Right lane closure
Where: From 300 feet before Tyco Road to 300 feet Dulles Toll Road exit ramp
Why: Manhole and sidewalk repairs
When: Monday, May 11, through Thursday, May 14, 8.a.m. - 3 p.m., and Friday, May 15, 8 a.m. - 2 p.m.
What: Right lane closure
Where: From 600 feet before Spring Hill Road to 300 feet after Spring Hill Road
Why: Manhole and sidewalk repairs
Spring Hill Road - Southbound
When: Monday, May 11, through Thursday, May 14, 8.a.m. - 3 p.m., and Friday, May 15, 8 a.m. - 2 p.m.
What: Right lane closure
Where: From 500 feet before Route 7 to Route 7
Why: Manhole and sidewalk repairs
Spring Hill Road - Northbound
When: Monday, May 11, through Thursday, May 14, 8.a.m. - 3 p.m., and Friday, May 15, 8 a.m. - 2 p.m.
What: Right lane closure
Where: From Route 7 to 500 feet passed Route 7
Why: Manhole and sidewalk repairs
Tyco Road - Northbound
When: Monday, May 11, through Thursday, May 14, 8.a.m. - 3 p.m., and Friday, May 15, 8 a.m. - 2 p.m.
What: Right lane closure
Where: From Route 7 to 500 feet passed Route 7
Why: Manhole and sidewalk repairs
<><><><><>
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.
|