Nighttime construction activities will take place over the weekend of Friday, April 15 to Sunday, April 17, causing lane closures and a detour on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH).
Please stay alert, obey all signage and drive carefully. All work is weather dependent and subject to change.
Dulles Toll Road (DTR) East
When: Friday, April 15 - Saturday, April 16, 9 p.m. to 5 a.m.
What: Left lane closed
Where: From mile marker 3.9 to 5.3 (from 3/10 mile before the Monroe Street overpass to 1/10 mile before the Reston Parkway overpass)
Why: Jack and bore operations
{"gmap":{"map":{"options":{"center":"(38.9555209031131, -77.3714935431633)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.952751042700505, -77.37979888916016)"},"marker1":{"position":"(38.951599639081635, -77.35370635986328)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
Dulles International Airport Access Highway (DIAAH) East
When: Friday, April 15 - Saturday, April 16, 9 p.m. to 5 a.m.; and Saturday, April 16 - Sunday, April 17, 9 p.m. to 5 a.m.
What: Eastbound lane reductions begin at 9 p.m. Eastbound full lane closures begin at 10 p.m. Follow detour; Eastbound DIAAH reopens at 5 a.m.
Where: From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why: Installation of a concrete span across the eastbound DIAAH, movement of large forms across Aviation Drive
{"gmap":{"map":{"options":{"center":"(38.96173885493322, -77.43820812799072)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95246736528457, -77.44889259338379)"},"marker1":{"position":"(38.962211868378226, -77.44305610656738)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
When: Friday, April 15 - Saturday, April 16, 6 p.m. to 5 a.m.; and Saturday, April 16 - Sunday, April 17, 6 p.m. to 5 a.m.
What: Right lane closed
Where: From mile marker 3.9 to 5.3 (from 1/10 mile before the Monroe Street overpass to 1/10 mile after the Reston Parkway overpass)
Why: Construction entrance acceleration/deceleration lane
{"gmap":{"map":{"options":{"center":"(38.95608249651609, -77.36130383111572)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.952667608284294, -77.37911224365234)"},"marker1":{"position":"(38.951699761878004, -77.35443592071533)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
Dulles International Airport Access Highway (DIAAH) West
When: Friday, April 15 - Saturday, April 16, 7 p.m. to 5 a.m.
What: Left lane closed
Where: From mile marker 2.8 to 1.9 (from 1/2 mile before the Centreville Road overpass to 1/5 mile before the Route 28 overpass)
Why: Duct bank work
{"gmap":{"map":{"options":{"center":"(38.959619859098545, -77.40803864099121)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.96067686434639, -77.4151611328125)"},"marker1":{"position":"(38.955537695776314, -77.40052700042725)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
When: Friday, April 15 - Saturday, April 16, 7 p.m. to 5 a.m.
What: Alternating right and left lane closures of varying lengths
Where: From mile marker 6 to 5 (from 1/5 mile past the Wiehle Avenue overpass to 1/2 mile past the Centreville Road overpass to 1/5 mile past the Reston Parkway overpass)
Why: Road work
{"gmap":{"map":{"options":{"center":"(38.95030887453958, -77.3566904316101)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.94812862803578, -77.34143257141113)"},"marker1":{"position":"(38.95270098206255, -77.35954284667969)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
<><><><><>
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.