Aug. 25, 2017
CONTACT: Marcia McAllister
T: 703-572-0506
C: 571-730-9117
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures Tonight on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and Sunrise Valley Drive - Friday, Aug. 25
Nighttime construction activities will take place on Friday, Aug. 25, causing lane closures on the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway and Sunrise Valley Drive.
See below for more detailed information. All work is weather permitting.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
<><><>
Dulles Toll Road East
When: Friday, Aug. 25, 10 p.m. to 6 a.m.
What: Three left lanes closed
Where: From mile marker 2.7 to 4.1 (from 1/10 mile past the Centreville Road bridge to 1/10 mile before the Fairfax County Parkway overpass), traffic will be reduced to a single right lane and diverted through the Herndon-Monroe Park & Ride. Follow detour.
Why: Pedestrian bridge installation
Dulles International Airport Access Highway (DIAAH) East When: Friday, Aug. 25, 10 p.m. to 6 a.m.
What: Full closure
Where: From mile marker 2.7 to 4.1 (from 1/10 mile past the Centreville Road bridge to 1/10 mile before the Fairfax County Parkway overpass), traffic will be diverted to a single lane on the eastbound DTR. Follow detour.
Why: Pedestrian bridge installation
Dulles International Airport Access Highway (DIAAH) West
When: Friday, Aug. 25, 7 p.m. to 5 a.m.
What: Two right lanes closed
Where: From mile marker 0.3 to 0.0 (from the Rudder Road overpass to Saarinen Circle)
Why: Aerial guideway construction
When: Friday, Aug. 25, 7 p.m. to 5 a.m.
What: Left lane closed
Where: From mile marker 5.5 to 4.7 (from 3/10 mile before the Reston Parkway overpass to 4/10 mile before the Fairfax County Parkway overpass)
Why: Civil work
Dulles Greenway East
When: Friday, Aug. 25, 10 a.m. to Saturday, Aug. 26, 5 a.m.
What: Left lane closed
Where: From mile marker 8.2 to 10.6 (from 3/10 mile before the Ashburn Village Boulevard overpass to 1/10 mile past the Broad Run bridge)
Why: Civil work
Dulles Greenway West
When: Friday, Aug. 25, 8 p.m. to 5 a.m.
What: Left lane closed
Where: From mile marker 11.0 to 9.7 (from the Old Ox Road overpass to 1/10 mile past the Loudoun County Parkway overpass)
Why: Civil work
Sunrise Valley Drive East and West
When: Friday, Aug. 25, 9 p.m. to 8 a.m.
What: Flagging operation
Where: Alternating lane closures at the intersection of Roark Drive and Sunrise Valley Drive past Hitchcock Drive
Why: Utility work
<><><><><>
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.
|